top of page

Sewage Treatment Plant

Client: Palm Utilities / Nakheel
DBO Contractor: Degrémont (Suez Environnement) / Sanotec and Besix
...and related collection and irrigation
networks. Jumeirah Golf Estates. Dalriada was commissioned by the Joint Venture to manage the contract administration for the project at the SPV level. The permanent facility was to process 220 000 m3 of waste water per day for a population of 900 000 inhabitants making it the largest membrane bio reactor (MBR) plant in the world. The associated temporary facility was to process 30 000 m3 of waste water per day.
bottom of page